chevron_rightDholera Smart City Project: Progress and Investment Insights
Many investors frequently ask about the deadline for the Dholera Smart City Project. The development of Dholera SIR is currently in progress, and according to official announcements:
Development Phase 1 will be completed soon.
Subsequent phases will follow.
Investors can track the ongoing progress and opportunities for investment.
The development of Dholera SIR Smart City is divided into three phases based on six town planning (TP) schemes:
Activation Area (22.5 sq. km in TP2) – Mostly an Industrial Zone, became operational in 2020.
Phase 1 (TP1 & TP2) – Expected to be operational by 2023.
Linear Development Plan – Near both sides of the Ahmedabad-Dholera Expressway, spanning TP1 to TP6, will be developed by 2030.
Complete Dholera SIR Area – Covering 920 sq. km, full development is expected by 2042.
Dholera International Airport – Construction started in 2020 and is set for completion in 2023.
Ahmedabad to Dholera Greenfield Expressway – Expected completion in 2023.
Ahmedabad to Dholera Rapid Metro Transport System – Expected completion in 2023, with future expansion to Bhavnagar.
Two runways: 2910m and 4000m, with parallel taxiways.
Annual capacity: 50 million passengers.
Strategic location: Close to major industrial cities like Rajkot, Vadodara, and Ahmedabad.
Expected to ease air traffic congestion at Ahmedabad Airport.
Receives approval under DMIC (Delhi Mumbai Industrial Corridor).
Seven stations planned along Ahmedabad-Dholera Expressway.
Travel time: 45 minutes from DSIR to Ahmedabad.
Dedicated Freight Corridor (DFC) – Covers 1483 km, with 38% in Gujarat, attracting 90 Billion USD in investments.
Six mega industrial nodes proposed for Gujarat.
Developing an Effluent Treatment Plant (ETP) for industrial waste management.
Ensures safe disposal of industrial effluents into water bodies.
MoU signed with Cerestra Ventures for Gujarat Special Education Region (G-SER).
5000-acre development featuring:
University district
Discovery district
Innovation district
Student housing and sports facilities
Companies like Wipro, IBM, and Cisco are invited to develop the city’s ICT framework.
Smart networking solutions will support the development of Trillion Dollar Baby’s digital infrastructure.
Watch the latest updates: Dholera SIR Ground Report 2021
Central admin office located in a commercial zone.
Single-window clearance system for legal permissions.
Command and Control Center for ICT and SCADA sensors.
Real-time fire safety and city monitoring through smart technology.
Phase 1:
TP1 – 51.4 sq. km
TP2 – 102.34 sq. km
Phase 2:
TP3 – 102.34 sq. km
TP4 – 66.6 sq. km
Phase 3:
TP5 – 74.75 sq. km
TP6 – 67.33 sq. km
Operational target: 2021 to attract MNCs and job opportunities.
Final completion: 2042, accommodating 20 lakh residents.
Government-backed investment opportunity with high returns.
Attractive benefits:
Low tax regime
Government subsidies
Super civic infrastructure
Ranked among India’s top projects, attracting global stakeholders.
One-stop investment solutions for premium residential, commercial, and industrial plots.
Free site visits from Ahmedabad, Gujarat.